Home page
Our Activities
Experiences
Testimonials
News Section
Contact us
Equipments
::
Port Related Activities
::
Download
::
Gallery
<< Previous Page
40 ft. Flatbed Trailer transporting Mud System Equipment
Foundation for Telecommunication Tower
Telecommunication Towers being erected by our inhouse technicians at Sirajgonj.
Two Shamolima Cranes working on the Drilling Rig Site
Concrete Blocks being lashed on Trailer for 55 km Pipeline Project
Concrete Blocks + 30" 3 LPE Pipes loaded on Trailer for Pipeline Project
Concrete Blocks + 30" Linepipes being lashed onto Trailer for ROW
30" Linepipes + Concrete Blocks on Trailers moving to Habiganj
Bended 30" Linepipes + Concrete Blocks on Trailer along ROW for Project
30" Concrete Coated Linepipes being unloaded along Right of Way (ROW)
Low Bed Trailer transporting Gas Plant Heater Equipment
Deutag Drilling, Country Manager seen inspecting loading of consignment
30" LPE Pipes with Concrete Blocks on Trailer
Big Concrete Blocks loaded onto Trailer for transport to Habiganj
Shamolima’s Low Bed ready to transport Cementing Unit
Cementing Unit being loaded on Shamolima’s Low Bed Trailer
Generator Sets on flat top Barges ready to be unloaded
Vessel fabricated by Shamolima to be used in a Sub-station of Chittagong Cement Clinker Factory
Transport of 35 Ton Mud Pump by 45 ton low bed Trailer
Transport of 35 Ton Mud Pump by 45 ton low bed Trailer
100 Ton Generator of HEIDELBERG CEMENT GROUP loaded onto 150 Ton capacity 6 Axle Low Bed Trailer
Preparatory work continued for offloading 100 Ton Generator from Low Bed Trailer
100 Ton Generator being slided from Low Bed Trailer onto wooden stack by indigenous method
Sliding process of 100 Ton Generator for offloading from low bed trailer
100 Ton Generator placed on foundation
100 Ton Generator placed on foundation
<< Previous Page
Home
::
Equipments
::
Port Related Activities
::
Download
::
Gallery
::
Contact us
Copyright © Shamolima Liimited. All rights reserved.